This report by Golder Associates (March 2009) gives practical steps to increase the municipal waste diversion rate — i.e. not to landfill or incineration — to 70% and beyond in Durham Region. The capital cost is a small fraction of what would be spent on the proposed incinerator.
Note: this is a large PDF file (7.5 mbytes). The file size listed below is inaccurate.